ENGINE MOUNTED – February 27, 2019 Once the wing was in place, it was time to put the engine on its mounts, and have it ready for connection to the engine accessories (alternator and AC pump), plus...
Switchblade Updates
Update – February 25, 2019
WINGS GO ON – February 25, 2019 The wing swing mechanism was likewise installed for a final time, but instead of painting the aluminum hinge beams, we clear coated them so we could enjoy the...
Update – February 25, 2019
WINGS GO ON – February 25, 2019 The wing swing mechanism was likewise installed for a final time, but instead of painting the aluminum hinge beams, we clear coated them so we could enjoy the...
Update – February 22, 2019
FRONT & REAR SUSPENSION INSTALLED – February 22, 2019 The rear suspension was added as a final installation to the rear tube frame. In the image above, you can see the shock absorber (black...
Update – February 19, 2019
NEGATIVE G WING TEST – PASS! – February 19, 2019 This test was less weight, but still critical. The certification standards also include a test for the loads the wing might see as you nose over...
Update – February 8, 2019
MAIN WING STRUCTURAL TEST – PASS! – February 8, 2019 There were two big milestones met in the past few weeks. The first (pictured above) is that we passed our Main Wing Structural Test, which is...
Update – February 6, 2019
TRANSFORMING TAIL MAGIC – February 6, 2019 We had been waiting for this moment, and now it has arrived. The transforming tail, moving on its own power, is truly a sight to behold. Organic, fluid,...
Update – February 1, 2019
COVERS GIVE ACCESS – February 1, 2019 We've shown photos of the Switchblade VT tail with the electric motors and the mechanism that rotates the tail. These working parts have been visible because...