SWITCHBLADE UPDATE   24 June, 2015

SWITCHBLADE UPDATE 24 June, 2015

Warren Blazenski, a machinist in Central Oregon, is carving metal for us, producing the wing root metal pieces for attaching the wing to the swinging wing structure. Shown is work on the hinge beam....

read more

SWITCHBLADE UPDATE: 2 May, 2015

We tested lighting configurations using the wind tunnel model. Almost all of our lighting will be LED, so we used LED lights of appropriate size to simulate the effects on the model and environment...

read more

SWITCHBLADE UPDATE: 2 May, 2015

We tested lighting configurations using the wind tunnel model. Almost all of our lighting will be LED, so we used LED lights of appropriate size to simulate the effects on the model and environment...

read more

SWITCHBLADE UPDATE 14 April, 2015

Our final part of the drag cleanup on the rear quarters of the vehicle included running the whole vehicle through CFD (Computational Fluid Dynamics) to check airflow and that we haven't created any...

read more

SWITCHBLADE UPDATE: 12 March, 2015

We bolted the hinges to the main wing so that we could test-fit the ailerons and flaps prior to bonding the ribs to the lower skin and spar. To do this we had to temporarily bond ribs in place to...

read more
SWITCHBLADE UPDATE:    6 March, 2015

SWITCHBLADE UPDATE: 6 March, 2015

While the steps below are being done at Samson for the prototype build, you should know that the Switchblade kit will come with these steps completed. In fact, the majority of the wing assembly will...

read more
SWITCHBLADE UPDATE:   22 February, 2015

SWITCHBLADE UPDATE: 22 February, 2015

We had the aluminum pieces made that act within the wing to transmit the pilot's input into the aileron movement, which banks the aircraft left and right. This is called a bell crank (don't ask me...

read more