SWITCHBLADE UPDATE:    1 November, 2015

SWITCHBLADE UPDATE: 1 November, 2015

Our first step to close out the left wing was to bond and bolt in the bottom spar bracket. This took a few hours to accomplish, and is a critical step in the process. This bracket has to align with...

read more

SWITCHBLADE UPDATE: 23 October, 2015

We continued assembly of the wing fixture or jig, which holds the wing parts in position while the wing is bonded and bolted together. Checking accuracy took some time, as we want the jig to be...

read more
SWITCHBLADE UPDATE: 12 OCTOBER, 2015

SWITCHBLADE UPDATE: 12 OCTOBER, 2015

The wing jig (metal framework that holds parts together in place) is being assembled and rigged for use. Below is shown the framework nearly completed and ready for the wing pieces to be placed...

read more

SWITCHBLADE UPDATE 18 September, 2015

Above is an image showing the major portions of the body plug that is now under construction. A plug is a positive full-size shape of a part, in this case the body. Plugs are used to make molds...

read more
SWITCHBLADE UPDATE   14 August, 2015

SWITCHBLADE UPDATE 14 August, 2015

We are building the jig, or fixture, that will hold the wings and all metal pieces in place while the assembly is bonded, drilled, bolted, and finished. While that is occuring, we are also finishing...

read more