BUSY HANGER – April 2, 2019 Our parking lot is getting full! With so many of the parts now arriving ready to be assembled, we had lots of opportunity to put people to work. So far, our record is...

BUSY HANGER – April 2, 2019 Our parking lot is getting full! With so many of the parts now arriving ready to be assembled, we had lots of opportunity to put people to work. So far, our record is...
PILOT CONTROLS GOING IN – March 28, 2019 The Switchblade's wings move, so getting the pilot controls out to the wing had to be done in a way so that the wing, when extended and locked into place,...
TURBO EXHAUST INSTALLATION PROGRESSING – March 25, 2019 The stainless-steel exhaust system is being welded together specially for the Switchblade. The pipes shown in the image above are now...
REMOTE ELECTRONICS INSTALLED – March 23, 2019 Once the rudder pedals were installed, we were clear to install the battery tray, and the remote electronics panel in the front baggage area. This front...
RUDDER PEDALS INSTALLED – March 21, 2019 There was a bit of a work-out regarding the rudder pedal installation. We went through three different rocker angles to get the most efficient setup for the...
FUEL TANKS FINISHED – March 18, 2019 All the fuel tank fittings were installed, and the baffles were placed inside the tanks before they were sealed up, ready for placement in the Switchblade. Owner...
TRANSMISSION TEASER – March 16, 2019 We still have the patent to finish for the Switchblade transmission, so aren't showing that quite yet. The image below shows a cover plate for this transmission,...
THE OTHER SIDE OF THE STEERING – March 14, 2019 The other side of the steering connects to the control column, which was installed earlier. The steering wheels will mount to the top left and right...