SWITCHBLADE UPDATE: 21 JULY, 2014

We have been busy! The ailerons have both been completed, and weigh less than two pounds each. Great job by our build team and the parts/mold team at Composite Approach. The intake manifold for the...

read more
SWITCHBLADE UPDATE:   MAY 17, 2014

SWITCHBLADE UPDATE: MAY 17, 2014

We have begun assembling the carbon fiber parts. It all begins with mixing glue.  The glue used in aircraft construction is very strong, and in this case is a two-part mix that has to be carefully...

read more
SWITCHBLADE UPDATE:  APRIL 7, 2014

SWITCHBLADE UPDATE: APRIL 7, 2014

We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...

read more
SWITCHBLADE UPDATE:  APRIL 7, 2014

SWITCHBLADE UPDATE: APRIL 7, 2014

We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...

read more
SWITCHBLADE UPDATE:  MARCH 17, 2014

SWITCHBLADE UPDATE: MARCH 17, 2014

Final results from the wind tunnel were received, with expected (very good) results! The big news was that our drag (resistance through the air) dropped 7% with the new tail. This is tremendous, as...

read more
SWITCHBLADE UPDATE:   FEBRUARY  26, 2014

SWITCHBLADE UPDATE: FEBRUARY 26, 2014

The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...

read more
SWITCHBLADE UPDATE:   FEBRUARY  26, 2014

SWITCHBLADE UPDATE: FEBRUARY 26, 2014

The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...

read more
SWITCHBLADE UPDATE:  FEBRUARY 6, 2014

SWITCHBLADE UPDATE: FEBRUARY 6, 2014

The Suzuki Hayabusa engine in our ground prototype is running! It took a lot of dedicated work by our build team, but the motor started up and sang a very pretty note after over a year of not being...

read more