opal

Update – July 14, 2018

Update – July 14, 2018

FITTING REAR BODY PARTS TOGETHER – July 14, 2018 A master at trimming, sanding and fitting the carbon fiber body parts, Brent Burch (above) is grinding along an edge of the rear bumper, using a...

read more
Update – July 13, 2018

Update – July 13, 2018

BELLY PAN INSTALLED – July 13, 2018 Here you can see the Switchblade belly pan installed to the center keel under the body of the prototype. This view is from the front of the cabin, looking back...

read more
Update – July 12, 2018

Update – July 12, 2018

REAR SUSPENSION COMING TOGETHER – July 12, 2018 These machined 'knuckles' are for the A-Arms and rear suspension. They're essential to getting the Switchblade prototype up on it's wheels and we were...

read more

Update 24 November, 2017

BIG NEWS: SAMSON JUST RECEIVED FUNDING SUFFICIENT TO COMPLETE THE BUILDING OF THE PRE-PRODUCTION PROTOTYPE, AND AS A RESULT, THE PRE-FLIGHT 60% OFF PROGRAM WILL BE CLOSING THE END OF THIS MONTH. The...

read more
Update – July 11, 2018

Update – July 11, 2018

LOOKING LIKE A HOVERCRAFT!  - JULY 11, 2018 Many people tell us they think the Switchblade is much cooler than the Jetsons, only we don’t hover. The above photo (taken from the rear of the vehicle),...

read more
AUTOWEEK

AUTOWEEK

THE YEAR WE TAKE FLIGHT
“Man is a fickle beast, always gazing beyond the marvels before him toward a better, brighter future.”

read more
Update – July 10, 2018

Update – July 10, 2018

TUBE FRAME COMPLETED – July 10, 2018 It was a happy moment when the Switchblade rear tube frame arrived home at the Samson Hangar! This is the result of countless hours of engineering (for the jig...

read more
Update 21 January, 2018

Update 21 January, 2018

Update 21 January, 2018 Above, Chief Builder, Ron Burch, is shown testing the LED turn signals built into the side mirrors. While the area of the turn signal lens cover (plastic cover) satisfied the...

read more