INTERIOR MODIFICATIONS DONE - March 4, 2021 Switchblade engineer, David Nobles recently inspected the interior modifications to the rear bulkhead. These were done to stiffen it and clean up the...

INTERIOR MODIFICATIONS DONE - March 4, 2021 Switchblade engineer, David Nobles recently inspected the interior modifications to the rear bulkhead. These were done to stiffen it and clean up the...
BULKHEAD INTERIOR - March 2, 2021 Once the modifications to the prototype's rear bulkhead were done, the interior faces of the bulkhead needed to have extra plies of carbon placed to make the front...
SWITCHBLADE (QUIET) VROOM VROOM - February 27, 2021 The 3-cylinder engine is much quieter than the V-4 we had previously. So quiet in fact, that we asked the guys working on the engine electronics...
"MIRROR, MIRROR ON THE (FIRE) WALL - WHO'S THE COOLEST FLYING CAR OF ALL?" - February 26, 2021 We had a deeper pocket in the rear bulkhead for the new engine, so had to re-do the fire protection on...
SWITCHBLADE REAR SUSPENSION MOUNTED - February 23, 2021 We finished mounting the rear suspension to the rear tube frame, and checked clearances with the new A-arms and shocks throughout the range of...
SEATS IN THE WORKS - February 19, 2021 As you may have heard, the engineering team for the Switchblade has moved onto doing Production Engineering. As part of that, we have been working on seat...
SWITCHBLADE REAR TUBE FRAME READY TO MOUNT - February 16, 2021 The revised rear tube frame was finished by the welder, who modified it for the new engine mounting and engine loads. It was then...
WELDING ENGINE MOUNTS - February 11, 2021 Brian Traynor finished welding the engine mounts yesterday and now we are prepping the tube frame for re-painting. Enough of the parts came for us to align...