ENGINE MOUNTED – February 27, 2019 Once the wing was in place, it was time to put the engine on its mounts, and have it ready for connection to the engine accessories (alternator and AC pump), plus...

ENGINE MOUNTED – February 27, 2019 Once the wing was in place, it was time to put the engine on its mounts, and have it ready for connection to the engine accessories (alternator and AC pump), plus...
WINGS GO ON – February 25, 2019 The wing swing mechanism was likewise installed for a final time, but instead of painting the aluminum hinge beams, we clear coated them so we could enjoy the...
WINGS GO ON – February 25, 2019 The wing swing mechanism was likewise installed for a final time, but instead of painting the aluminum hinge beams, we clear coated them so we could enjoy the...
Building My Dream I have a dream…a dream about the future of travel. This future sees a time when travel is safer, faster and far more convenient. As of this writing (late 2018), we are right on the...
FRONT & REAR SUSPENSION INSTALLED – February 22, 2019 The rear suspension was added as a final installation to the rear tube frame. In the image above, you can see the shock absorber (black...
Samson Sky Unveils Transforming Tail
The Samson Switchblade – world’s most popular flying car – has just achieved one of the biggest milestones in the company’s ten-year history.
NEGATIVE G WING TEST – PASS! – February 19, 2019 This test was less weight, but still critical. The certification standards also include a test for the loads the wing might see as you nose over...
MAIN WING STRUCTURAL TEST – PASS! – February 8, 2019 There were two big milestones met in the past few weeks. The first (pictured above) is that we passed our Main Wing Structural Test, which is...