MORE PROOF THAT THE SWITCHBLADE IS THE MOST POPULAR FLYING CAR IN HISTORY!! - April 20, 2020 In the last 39 days, 41 people have Reserved their Switchblade!! This is an all time high for a month...
Switchblade Updates
Update – April 17, 2020
INSTALLING FINAL HARDWARE FOR AILERONS - April 17, 2020 Samson Mechanical Engineer David Nobles is installing the final hardware for the Switchblade ailerons. The access panel allows him to get his...
Update – April 15, 2020
REMOVING WIRING AND SAVING WEIGHT - April 15, 2020 In the previous post, we showed Sean Bliss removing some wiring from the Switchblade cockpit, as we are simplifying the electrical system. He's not...
Update – April 15, 2020
REMOVING WIRING AND SAVING WEIGHT - April 15, 2020 In the previous post, we showed Sean Bliss removing some wiring from the Switchblade cockpit, as we are simplifying the electrical system. He's not...
Update – April 13, 2020
WIRING CONSOLIDATION - April 13, 2020 While waiting for an engine part to arrive, we dove into the wiring of the Switchblade prototype. We had earlier found a simpler means of wiring that eliminated...
Update – April 10, 2020
INTERCOOLER UPGRADE - April 10, 2020 The turbo compresses air to help make the engine breath better. When air is compressed, it heats up! The intercooler is like a radiator for the intake air,...
Update – April 9, 2020
WIRING THE TAIL - April 9, 2020 With the Switchblade boom and VT tail on, the team is doing the necessary steps to get the tail controls connected up from the cockpit. Samson Mechanical Engineer...
Update – April 8, 2020
SWITCHBLADE TAIL PREP - April 8, 2020 The Switchblade tail is shown being positioned in place before being bolted up. We are doing this in preparation for the next step, which is connecting the...