VINYL WRAP INSTALL – July 10, 2019 In the above image, the vinyl wrap is going on, with our signature Ferrari Red color. Ryan Ford (back to camera) and Austin Price of Dana Signs in Redmond did a...
Thomas
Update – July 9, 2019
ALMOST READY FOR INSTRUMENTS TO BE INSTALLED – July 9, 2019 (Posted 10/9/19) Our Chief Builder, Ron Burch is doing some finishing touches, before the instruments are installed. A Dynon Skyview flat...
Update – July 8, 2019
MAKING IT LOOK GORGEOUS! – July 8, 2019 (Posted 10/9/19) Casey Beard of Stitch Craft Upholstery did his magic on the Dash Display, in his usual great form. First he covered the fiberglass with a...
Update – July 5, 2019
DASH CENTER CONSOLE – July 5, 2019 (Posted 10/9/19) Sam Bousfield fabricated the curved fiberglass plate, which was placed behind some of the instruments in the center console. Above, you can see...
Update – June 29, 2019
NICE FIT FOR OUR TEST PILOT! – June 29, 2019 Below is shown test pilot Ron McElroy, who is seated in the Switchblade prototype with his test flight helmet on and his parachute strapped to his back....
Update – June 28, 2019
ROUTING FOR THE DYNON NETWORK CABLES – June 28, 2019 Above, Nick Leonard (Kit Builder & Switchblade Owner) and Luke Cardwell (Avionics Technician from Evolution Aircraft) are working out the...
Update – June 25, 2019
AVIONICS READIED TO GO INTO PROTOTYPE – June 25, 2019 Above is part of the avionics (flight instruments) being put in the Switchblade prototype. This is the same Dynon Skyview that will come...
Update – June 24, 2019
DOCTORING THE DUCT – June 24, 2019 In the image below, Ron Burch (Chief Builder), and son Brent Burch, are working on the business end of the Switchblade's body. Between the two of them, they have...