Composite Approach

EXHAUST ON AND WRAPPED – December 15, 2021

EXHAUST ON AND WRAPPED – December 15, 2021

The exhaust pipes were welded and installed on the engine in the engine bay. The crinkly surface is aluminum and insulation to control exhaust heat in key areas. Still to be installed is one small...

read more
ELECTRICAL SIMPLIFIED – December 09, 2021

ELECTRICAL SIMPLIFIED – December 09, 2021

In getting everything set up for the Samson 3, we spent a few days simplifying things, as there was a lot of wiring in the engine bay that just didn't need to be there. The Electrical Tech (Phillip...

read more
PROP SHAFT DONE – December 6, 2021

PROP SHAFT DONE – December 6, 2021

One of the major portions of getting this new engine installed was to create a new driveshaft linking the engine/gearbox to the propeller. We didn't mind having to re-do the prop drive shaft, as it...

read more