SWITCHBLADE UPDATE:  APRIL 7, 2014

SWITCHBLADE UPDATE: APRIL 7, 2014

We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...

read more
SWITCHBLADE UPDATE:  APRIL 7, 2014

SWITCHBLADE UPDATE: APRIL 7, 2014

We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...

read more
SWITCHBLADE UPDATE:  MARCH 17, 2014

SWITCHBLADE UPDATE: MARCH 17, 2014

Final results from the wind tunnel were received, with expected (very good) results! The big news was that our drag (resistance through the air) dropped 7% with the new tail. This is tremendous, as...

read more
SWITCHBLADE UPDATE:   FEBRUARY  26, 2014

SWITCHBLADE UPDATE: FEBRUARY 26, 2014

The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...

read more
SWITCHBLADE UPDATE:   FEBRUARY  26, 2014

SWITCHBLADE UPDATE: FEBRUARY 26, 2014

The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...

read more
SWITCHBLADE UPDATE:  FEBRUARY 6, 2014

SWITCHBLADE UPDATE: FEBRUARY 6, 2014

The Suzuki Hayabusa engine in our ground prototype is running! It took a lot of dedicated work by our build team, but the motor started up and sang a very pretty note after over a year of not being...

read more
SWITCHBLADE UPDATE:  JANUARY 12, 2014

SWITCHBLADE UPDATE: JANUARY 12, 2014

While the wing structural engineering and mold drawings are being accomplished, the Samson build team turned their attention to getting the ground prototype back up on its feet. We are taking test...

read more
SWITCHBLADE UPDATE:  JANUARY 12, 2014

SWITCHBLADE UPDATE: JANUARY 12, 2014

While the wing structural engineering and mold drawings are being accomplished, the Samson build team turned their attention to getting the ground prototype back up on its feet. We are taking test...