TORQUING THE SWITCHBLADE'S TRANSMISSION - May 28, 2020 The transmission case was closed up yesterday, and the case bolts were tightened to specific settings to complete the assembly. We now have a...

TORQUING THE SWITCHBLADE'S TRANSMISSION - May 28, 2020 The transmission case was closed up yesterday, and the case bolts were tightened to specific settings to complete the assembly. We now have a...
TRANSMISSION INSPECTION AND REBUILD - May 26, 2020 We mentioned earlier that the Switchblade's transmission has passed its endurance test, and that we were taking it apart to review the...
SWITCHBLADE RUDDERS UNDER PILOT CONTROL FOR FIRST TIME - May 22, 2020 The Switchblade rudders have been tested and worked extensively with the tail off the body. Here is a short video clip of the...
AIRVENTURE 2020 STATUS - May 21, 2020 With over 650,000 attendees from dozens of countries, 3,500 volunteers and months of preparation time, there was really no way for EAA to hold AirVenture this...
SWITCHBLADE STEERING CORRECTION - May 20, 2020 The new cable for the elevator developed some extra resistance, and we were curious how this would happen. It seems that the ball bearing push cables...
ELEVATORS MOVING UNDER PILOT CONTROL - May 15, 2020 This short video clip shows the elevators in the tail being moved by the pilot in the cockpit. David Nobles, Samson Sky Mechanical Engineer, put...
CONNECTING THE ELEVATORS TO THE PILOT - May 14, 2020 David Nobles, Samson Sky Mechanical Engineer, is putting the final touches on the elevator pilot control connection in the cockpit. We designed a...
RE-CHECKING THE SWITCHBLADE SWITCHES - May 12, 2020 Sam Bousfield is shown checking that the prototype's switches are all labeled and reachable. These have been checked before, but another pair of...