AVIONICS WIRING CLEANED UP – April 5, 2019 We had earlier installed the remote electronics, located in the forward storage area. These needed to have the wiring grouped, bundled, and tidied up to...
opal
Update – April 4, 2019 II
TEST PILOTS IN THE SHOP – April 4, 2019 Both of our test pilots came to visit. Our test pilots both like to stop in to review progress, go over the build process, and satisfy that 'hunger for the...
Update – April 4, 2019
RADIATOR DUCT MOLDS – April 4, 2019 We have mounted the two sets of radiators and need ducts to route the incoming air through the radiators. Ducts do two things: they channel the air and keep it...
Update – April 2, 2019
BUSY HANGER – April 2, 2019 Our parking lot is getting full! With so many of the parts now arriving ready to be assembled, we had lots of opportunity to put people to work. So far, our record is...
Update – April 2, 2019
BUSY HANGER – April 2, 2019 Our parking lot is getting full! With so many of the parts now arriving ready to be assembled, we had lots of opportunity to put people to work. So far, our record is...
Update – March 28, 2019
PILOT CONTROLS GOING IN – March 28, 2019 The Switchblade's wings move, so getting the pilot controls out to the wing had to be done in a way so that the wing, when extended and locked into place,...
Update – March 25, 2019
TURBO EXHAUST INSTALLATION PROGRESSING – March 25, 2019 The stainless-steel exhaust system is being welded together specially for the Switchblade. The pipes shown in the image above are now...
Update – March 23, 2019
REMOTE ELECTRONICS INSTALLED – March 23, 2019 Once the rudder pedals were installed, we were clear to install the battery tray, and the remote electronics panel in the front baggage area. This front...