INTERIOR MODIFICATIONS DONE – March 4, 2021
Switchblade engineer, David Nobles recently inspected the interior modifications to the rear bulkhead. These were done to stiffen it and clean up the cabin inside where we bumped in for the new engine installation. The work by Steven Lorentzen’s group was very clean and David gave it two thumbs up!