Update – April 9, 2020

April 9, 2020

WIRING THE TAIL – April 9, 2020

With the Switchblade boom and VT tail on, the team is doing the necessary steps to get the tail controls connected up from the cockpit. Samson Mechanical Engineer David Nobles is shown here making some minor adjustments to the elevator travel. (To give you a sense for the height of the tail, the T is 8 ft 3 inches from the floor.)

Contact Us

Subscribe to our monthly Newsletter

Get the Latest Switchblade Updates

Follow Us On