RIVETING ON THE CENTER CONSOLE – April 24, 2020
Up until now, the center console for Switchblade prototype has been fixed temporarily in place. Today, Sean Bliss fully installed it by riveting it to the floor of the cockpit with 2 aluminum angle rails. The wiring will run inside the center console, providing power to the avionics and the VP-X electronic circuit breaker. Another step DONE!