These images show progress on the tube-frame ‘test mule’ being built at BurkeBuilt near San Clemente. We should have the test mule completed by the end of next week, and then it will ship to Auburn, California, where it will be mated with the front suspension and steering mechanism under construction there. Rear suspension is being designed to be incorporated on the back section, along with the differential to take power to the wheels. It is getting more exciting now that we are indeed cutting metal.