NEW INTERCOOLER PLUMBING – March 9, 2020 With the Switchblade prototype's temporary intercooler location now being the top of the vehicle (until we establish that the size works), we had to re-do...
NEW INTERCOOLER PLUMBING – March 9, 2020 With the Switchblade prototype's temporary intercooler location now being the top of the vehicle (until we establish that the size works), we had to re-do...
BIG POWER IN PLACE – March 6, 2020 Although we reduced our load on the Switchblade's electrical system lately, we were still close to the maximum of what the 50-amp alternator could produce. We had...
BIG POWER IN PLACE – March 6, 2020 Although we reduced our load on the Switchblade's electrical system lately, we were still close to the maximum of what the 50-amp alternator could produce. We had...
BIGGER ELECTRICAL POWER SOURCE – March 5, 2020 We increased the Switchblade prototype power needs when we added the new radiator fan, so we opted to put the larger 70-amp alternator into the engine...
FITTING UP THE AIR SCOOP FOR THE INTERCOOLER – March 2, 2020 We relocated the Switchblade intercooler and put a scoop on it to increase the airflow. Ron Burch has been the lead on this project. He's...
"COOL STUFF"- MEASURING FOR THE NEW FAN SHROUD – February 27, 2020 Now that we have worked out the cooling solution for the Switchblade prototype engine, it's time to do a final radiator fan shroud....
SWITCHBLADE ENGINE TUNING ACTION – February 26, 2020 Engine tuner Roger Dawes is in the passenger seat (with the tuner laptop) and Sean Bliss is at the throttle and controls. The team was all...
TUNER PLANNING – February 24, 2020 Roger Dawes, our tuner from Loyning's Engine Services in Portland, came to help troubleshoot the replacement engine for the Switchblade prototype. A few weeks ago,...