Update – March 8, 2021

March 8, 2021

DOUBLE CHECK THOSE WINGS – March 8, 2021


The Switchblade rear tube frame was welded rather extensively for the new motor mounts and reinforcements related to a new engine installation. We double-checked to ensure that the wings were still being held correctly by the tube frame by mounting the wings and checking angles and dimensions. Better to do this before the engine is installed, in case there is a correction to be made on the tube frame. Everything checked out just fine!

Contact Us

Subscribe to our monthly Newsletter

Get the Latest Switchblade Updates

Follow Us On