Joel is shown drilling out hard points to bolt down the rear seat rails in the final location. We had temporary bolts up till now, but for flight testing needed all of the bolts in place.
DRILLING HARDPOINTS – June 1, 2021
Switchblade, Samson Sky, Skybrid, and Skybrid Technology are trademarks or registered marks, and are used with permission on these pages.