ALMOST READY FOR INSTRUMENTS TO BE INSTALLED – July 9, 2019
(Posted 10/9/19) Our Chief Builder, Ron Burch is doing some finishing touches, before the instruments are installed. A Dynon Skyview flat screen will go in the top space, with the large rectangular opening.