FINALIZING WIRING IN THE CABIN – January 27, 2020
Now that we’re wiring up the engine again and getting all the systems in place, it’s time to finalize the wiring in the prototype cabin. Electrical Engineering Consultant Mike Cannon (left) has been very productive and working 7 days a week, since arriving here from Southern CA. Sean Bliss (right) has also been checking off lots of his targets. In this photo, they are working on the switch panel, at the front of the cabin.