ENGINE FINAL INSTALL INTO TUBE FRAME – December 14, 2021

December 14, 2021


The Samson 3 engine was placed back into the Switchblade tube frame so that the final wiring, plumbing of fuel, radiator and intercooler piping, and attachment of the alternator and oil reservoir could occur. The image shows the engine with a gearbox attached now installed into the tube frame, along with the propeller shaft.

Contact Us

Subscribe to our monthly Newsletter

Get the Latest Switchblade Updates

Follow Us On