The Samson 3 engine was placed back into the Switchblade tube frame so that the final wiring, plumbing of fuel, radiator and intercooler piping, and attachment of the alternator and oil reservoir could occur. The image shows the engine with a gearbox attached now installed into the tube frame, along with the propeller shaft.
ENGINE FINAL INSTALL INTO TUBE FRAME – December 14, 2021

