Cascade Business News

EXCITING ROLL-OUT – April 14, 2022

EXCITING ROLL-OUT – April 14, 2022

After a safety briefing with the team, and final check over of the vehicle, we rolled the Switchblade flying car prototype out of the hangar, on its way to our first day of taxi testing. The weather...

read more
DOORS ON – April 12, 2022

DOORS ON – April 12, 2022

As we button up the Switchblade, the doors are the last things to go on for any outside testing. In this image we have the doors on, with part of the test team outside of the hangar, getting ready...

read more
CRITICAL WIRING – April 08, 2022

CRITICAL WIRING – April 08, 2022

One of the most critical installations is the fly-by-wire rudder system located in the Switchblade's tail. The rudder points the nose left and right on the aircraft, and is used to make an aircraft...

read more
AVIATION BALANCING ACT – April 07, 2022

AVIATION BALANCING ACT – April 07, 2022

As we mount the wings and tail on the vehicle for flight testing, we are balancing the control surfaces that are the moving parts of the wing and tail. In flight, these parts are directed by the...

read more