We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...

We had a great time doing slalom testing of the Switchblade ground prototype! Our 700' course was set up with eight cones spaced 100' apart, per the standards of the Road and Track slalom testing...
Final results from the wind tunnel were received, with expected (very good) results! The big news was that our drag (resistance through the air) dropped 7% with the new tail. This is tremendous, as...
The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...
The wind tunnel testing at the University of Washington in Seattle was finished last Friday to good result, with the initial results showing that the final tail design produced significant increase...
The Suzuki Hayabusa engine in our ground prototype is running! It took a lot of dedicated work by our build team, but the motor started up and sang a very pretty note after over a year of not being...
While the wing structural engineering and mold drawings are being accomplished, the Samson build team turned their attention to getting the ground prototype back up on its feet. We are taking test...
While the wing structural engineering and mold drawings are being accomplished, the Samson build team turned their attention to getting the ground prototype back up on its feet. We are taking test...
You may have heard mention of the wind tunnel model that Samson tested in the University of Washington wind tunnel recently. I thought I might show more photos of that model and process, as it was...