Events & Updates
WIRING ALMOST DONE – May 11, 2021

WIRING ALMOST DONE – May 11, 2021

We had to completely rewire for the new engine, and that meant new connections through the firewall and into the cabin. In this case we opted to have a removable plate to house the different cable...

read more
Update – May 7, 2021

Update – May 7, 2021

NEW HOME FOR BATTERIES - May 7, 2021 We have multiple batteries in the Switchblade, as we have a fly-by-wire rudder system that depends on electricity to function and need the redundancy. Two...

read more
Update – May 6, 2021

Update – May 6, 2021

REVERSED PROPS UNPACKED!! - May 6, 2021 Switchblade Assembly Tech Sean Bliss is shown unpacking and examining the reverse props from Sterna Propellers. We had received props from Sterna earlier, and...

read more
Update – May 4, 2021

Update – May 4, 2021

SOMETIMES SMALL IS BEST - May 4, 2021 The Switchblade's fuel pumps need to produce lots of flow and lots of pressure. On the other end of things, we needed a very small pump for oil to an isolated...

read more
Update – May 3, 2021

Update – May 3, 2021

WHAT IS A HEADER TANK? - May 3, 2021 With multiple tanks, you will probably want to drain to a common tank, called a header tank, and pump the fuel from that point. It is the lowest place in the...

read more
Update – April 28, 2021

Update – April 28, 2021

EXHAUST COMPLETED - April 28, 2021 The silver coated exhaust was fully installed to the rear of the vehicle. New mount locations were welded on or bolted on, and it is a very sturdy assembly, ready...

read more