FINALIZING SUSPENSION HARDWARE - April 1, 2021 Nick Yakola is swapping out some of the hardware for the rear landing gear. Nick had earlier installed the limit straps to prevent the landing gear to...

FINALIZING SUSPENSION HARDWARE - April 1, 2021 Nick Yakola is swapping out some of the hardware for the rear landing gear. Nick had earlier installed the limit straps to prevent the landing gear to...
ELECTRICAL CLEANUP - March 29, 2021 Phillip Mikula, Electronics Tech at Samson, has been working to clean up the electrical wiring in the cockpit, as we found we could remove much of the wiring...
CHECKING ROUND - March 25, 2021 The Switchblade duct was fitted after reducing some interference points with the newly massaged tube frame. We then pulled out a wheel-shaped fixture that we use to...
ENGINE FINAL MOUNTING - March 23, 2021 The new 3-cylinder engine is mounted in the Switchblade engine bay. We are waiting for the two drive shafts to set the exact location of the engine, but in the...
NEW ENGINE, NEW MUFFLERS - March 19, 2021 The production engine for the Switchblade has a different sound than the V4 test engine and slightly different needs for a muffler. We chose a muffler...
SWITCHBLADE FLYING CAR -- TAIL DEFLECTION TESTING - March 16, 2021 One of the tasks being done at the same time that the new engine is being installed was to tighten up the elevator control system....
T-BAR ALIGNMENT - March 12, 2021 This week we modified the T-bar and re-mounted it in the prototype. The T-bar handles steering controls for driving and elevators for flying. Sean Bliss (left) and...
CHECKING THE TAIL - March 10, 2021 We checked the Switchblade tail angles after installing the tail on the tube frame. This was to make sure that the tail horizontal remained level after the...